Quick answer
When Permits fails, troubleshoot in order: file/format, permission/lock, output settings, another tool. Structure/electrical/drainage may need permits.
Why it matters
Start with the most common and cheapest causes to narrow it down fast.
Structure.
Step by step
- Check humidity/water/mold/ventilation/structure/area.
- Separate vapor barrier/dehumidifier/drainage/insulation/sealing.
- Get 2-3 quotes; confirm scope/humidity/warranty.
- Contract states scope/drainage/payment/warranty.
Common mistakes
- Barrier only, not water/drainage.
- Ignoring mold/ventilation/structure.
- Not checking dehumidifier/warranty.
- No drainage/payment terms.
Checklist
- Humidity/water/mold/ventilation/structure.
- Vapor barrier/dehumidifier/drainage/insulation/sealing.
- Drainage/pump/power/permits.
- Warranty/payment/contract.
- Budget/maintenance/energy.
Key facts
- Structure.
- Electrical.
- Drainage.
FAQ
How do I troubleshoot a failed Permits task?
When Permits fails, troubleshoot in order: file/format, permission/lock, output settings, another tool. Structure/electrical/drainage may need permits.
How long does it take?
Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.
Is data uploaded?
Runs locally and does not upload video/audio; extensions may still read the page.
Source: EPA